For an edible oils refinery client, KRAFT executed a comprehensive scope of works including the installation of 50 pipe rack assemblies and 10 bridge stair units, mechanical installation of 60 pump skids, and electrical and instrumentation works comprising approximately 55,000 meters of cabling and 4,300 meters of cable trays. The scope also included heat tracing with 340 terminations and 3,200 meters of traced lines, insulation works covering approximately 25,000 square meters, and all lifting activities, including critical and heavy lifts. In addition, KRAFT managed warehouse operations and provided pre-commissioning and commissioning support to ensure a smooth and controlled handover.
Multidisziplinäre Belegschaft bei Spitzenauslastung
Geleistete Engineering- und Baumannstunden
Installiert und gewartet über den gesamten Standort
Our work in action

Huntsman Chemicals Cronos Project
Lassen Sie uns gemeinsam etwas Zuverlässiges aufbauen
Haben Sie eine Frage oder ein Projekt im Sinn? Unser Team ist bereit, Ihre Herausforderung zu besprechen und gemeinsam die richtige Lösung zu finden.